1h 4min · about 11,800 wordsDownload Transcript
0:00Hello everyone. My name is Peter Lupam. I'm a telecommunications attorney. I specialize in everything you do with FCC law. Municipal tower management is today's topic, but I also do rights of way management, do 5G rollouts. I also deal with, you know, revising and updating existing telecommunications laws, for example, on towers, which is a different set of regulations. So today we're going to talk about municipal tower management. We're going to look at a very unique opportunity, very timely opportunity, and a fleeting opportunity to manage towers on behalf of municipalities and be able to make a lot of money for the municipalities.
0:38We'll talk about most of the fundamental underpinnings of tower management. So a lot of things regarding the law and construction and SEC laws that regulate it. But it is in the end a business opportunity for municipalities. And I think this is going to be a great opportunity for municipalities because it's going to be a great opportunity to monetize in an environment where inflation is very high, where you have to start paying people more money and pay more money for things like salt and other types of material. It's going to be a very good opportunity to start offsetting some of these additional expenses. So as I mentioned before, this is a fleeting opportunity, really. It's going to be from 2025 to 2030, as the bulk of these leases that are roughly 25, 30 years are going to be expiring. We're going to talk a little bit about tower management basics. So if the town decides to assume tower ownership, what would be involved with that? We'll talk some of the legal considerations. We'll talk a little bit about requests for proposals, RFPs, how that should be issued, and some best practices.
1:40We'll talk a little bit about insurance thresholds and types and very important to have your tower insured and the carriers on there have the proper insurance to protect you and the community you represent. Talk about 10 disputes between carriers, maybe interference between carriers because of the signals, some liability considerations, tower compound and easements, some additional considerations like tower management portal. We'll talk about the value of having everything in one place. There's a lot of information, a lot of documents with managing a tower. And I have a tower management portal that my cto, Paul Rowe, has designed. We have some emerging technologies we'll talk about in the context of tower management. And then first we'll do a takeaway and talk about some parting thoughts.
2:27So as mentioned before, we'll talk about how this is a fleeting opportunity, how this is a very something that needs to be taken advantage of the next few years or it'll be something that will be lost to the municipality. So we'll see that this is not a random moment because most of the leases were signed in the late 90s or early 2000s. And many of these lease documents had a surrender provision. And this was an inducement to local municipalities in order to get into it. Most municipalities were concerned that if they had they had a tower there at the end of it, they would carry, just pick the leaf and they'd be stuck with a monopole in their backyard and they would not have to spend a lot of money to get have it taken away.
3:11So they had the carrier put in a surrender provision. So we'd say at the very end that the misspell had a chance of either taking over management of the tower they could use for anything they want. Maybe lighting it could be for emergency responders or have their antennas on top of there. Any number of reasons, or if they decide they didn't want it, they would have the carrier pick up and take it away. So this was something that was put directly into the lease and as it was signed. And this is a very common provision. Some leases are silent on this. One of the first things they want to look at is see if there's a surrender provision. We'll get into that a little bit.
3:46So we're looking at of course, the United States, roughly $500 million over the next 20 years. There's roughly 142,000 cell sites in the U.S. there's roughly 19,400 municipalities. And most of these towns have cell towers on their own public land. So these are opportunities to own this. Many of these municipal tower leases were signed in the 90s to the early 2000s, which is why I mentioned 2020, 25 to 2030 as the optimal periods of time in which to take advantage of this. So 1995 to 2000, number of towers on public land were installed in that range. Typical lease terms of 25 years. So usually one year, five year initial term plus four or five year renewal terms. So. So 25 years, I've seen a little less, a little more, but that's the most common. See lots of expired prime leases between 2025 and 2030 mainly contain provisions where municipality assumes have ownership at the expiration of all the term. So after the renewal periods expired, there was that provision. Opportunities still abound.
4:49The window is closing. It's really fleeting, but it's here right now. And I think if you're watching this video, it's very Timely. So here we see the amount of revenues. Based on the formula, I'm going to say it's about roughly around $533 billion. Starting $533 million of money across the United States that could go and flow directly to municipalities rather than either the carriers or tower management companies that own it. So this is very disruptive, but beneficial to local communities and their constituents. So here again, we see roughly 25% of all cell towers built between 95 and 2006. Big boom. This big, big bang. You know, if you want to call it telecommunications. 30% of these towers are public land with roughly two and a half tenants per tower. So you see that tower companies, this is how they make the money. They pay roughly 25% of the total revenue to the private landlord. And in our discussion, that would go to the municipality.
5:4775% of revenue retained to make a viable business model. Very nice. Obviously, making a good amount of money. If you're talking $2,000 for the average carrier, Ren, the tower management company makes $1500 times two or three carriers. You know, you're looking at, you know, four, you know, looking at $4500, $5000 a month that they make on that on municipal land. And there's big variations between how much money is received in urban areas. If you're in midtown Manhattan, obviously you're paying a lot of money as a carrier, paying maybe 10, 12, $13,000 a month, if you can believe it. And if you're in more of a rural area, farm area, maybe 1500, $2000 a month. But that's going to be driven by market forces.
6:27Major cities can as many as 25 to 50 cell sites on public land. So if you're in a place like San Diego, you could be sure that you're looking at quite a bit of cell sites on public lands. We have small towns usually find them, towers of municipal complexes, water tanks. Those are very common. And counties and states often have sites along public roads and public parks, not uncommon. So again, $533 million roughly to be made over the next 20 years just for municipalities, if they decide and elect to go over to a tower management model, which I find all my clients in New Jersey, after discussions with mayor and council, decide to move forward with it. So let's go over a little bit of a tower manager, plumber. We'll go over a little bit of maybe towers for 101. So you see at the very top, you see a whip antenna, you see a small whip arm mount.
7:19So that's where the whip antennas go. Whip antennas typically done for local law enforcement and emergency responders. Highest antenna sectors, you see that over here you see high, middle and lows. So you see each one typically and depending on the carrier, the highest elevation allows for the greatest signal propagation. So carriers typically like to be on the top highest. But again it doesn't necessarily work for all of them. And then you see cable ladder for coax and fiber. You see the fiber running up directly the middle of the self supported tower. And then you see the equipment compound itself. This one has to be enclosed in a building, but they're often also out on platforms or exposed to the elements. So to build that way as outdoor intensity or outdoor companies I should say. So let's talk a little bit about the different types of relationships between property owners. You have different site types. You have municipal complexes which is very common.
8:09Behind police stations or municipal buildings, water tanks, high schools and high school right near high school football fields. Those are very common. You have different landowner types. You have the boards of education, private landowners, municipal, county, state. We're primarily here interested in terms of tower management on behalf of municipal ownership. But it could also be done for private owners as well. You have tower managers can own tower, own the tower and manage the tower on behalf of someone else. Usually maybe, perhaps a carrier likes to like Verizon may decide to do it. You have different lease types. You have the prime lease which is for the tower itself typically.
8:49And then you have separate ground leases which are for the each carrier, as I mentioned before, they need cabinets which contain readings units in it to power up the antennas itself to transmit a receive signal. Then the tower lease which is usually signed by any of the sub lessees on it. So if Verizon was the first on the tower and they happen to own the tower, they may lease it out to AT&T and to T Mobile. If it's owned by a tower management company like Crown Castle, they would sublease to each one of these carriers. So you see relationships tower managers separate ground and tower leases is a kind of typical.
9:26So the wireless tower business and the management model give a little bit like this. Some of the common companies you might have heard of represent local municipalities are companies like Crown Castle, American Tower Corporation. The like the built their business on leasing vertical real estate to such as Verizon, AT&T and T Mobile to enable them to deploy network infrastructure without owning the towers themselves. This business model merged because a lot of carriers start selling off their tower assets to focus on things like buying Spectrum. So the FCC owns all the frequencies in the country and they then start doing a open bidding process. They auction off blocks of bandwidth and they're very expensive. It's very, very competitive. So each carrier wants to get this, you know, this block of spectrum. They're very aggressive and they're very expensive. So for them, selling off their tower towers, for them is a quick and easy way of raising money to get additional spectrum. So let's go over the business model of tower management. Companies, they build, own and lease. That's their, their model. So they can build it. They can sometimes buy out from wireless carriers, sometimes they go to other types of private landlords and they buy out maybe rooftop lease. They come up with a formula which I'll discuss shortly how they buy that.
10:45So companies build, acquire, lease towers from municipalities or private landlords. They negotiate ground leases also because that's where in terms tower, that's where they put the ground equipment, as I mentioned before. And wireless carriers pay monthly rent per antenna position on the tower. So each elevation they have to pay a dollar amount. We'll get into that shortly about how that works with the RFPs. And typical lease terms range from 10 to 25 years with escalation clauses, roughly 3% annual increases. Sometimes people do CPI. Although carriers don't like CPI because it potentially be more expensive. It's also having to calculate it. They try to avoid cpi. It's fixed annual increases. Also it's easier to plan financially for them. Unknown how inflation is going to look, but they can plan out the next 20 years based on fixed dollar bills.
11:37So wireless tower business in the management model, there's politician strategy. Getting as many tower tenants on there as possible is key. That's how they really maximize it. So many towers could accommodate up to three to five tenants. But some high demand locations, they have more. So for example, you have ground lease agreements. The entire company does not own the land. It pays a ground lease fee to the property owner, which is good for the property owner. Some companies offer lump sum payouts and we'll get to that a little bit more to reduce long term costs. So this is their model here you see you have tenant leases, you have wireless carriers, public safety networks on there, government defense agencies, Internet service providers, fixed wireless providers of private networks, fiber and small cell infrastructure, which is expanding business credit Castle focused on fiber to support 5G networks. They also own towers.
12:28But they're trying to anticipate the future which they've started investing in right now. And you see that ATC and SBA have invested in international expansion and edge data centers, which is a remote way of processing requests and data instead of going to a centralized center to do it all. So tower acquisitions, buyouts. They buy existing towers from carriers or small companies to expand their portfolio, increase their revenue. Some of the recent deals include atc. They purchase towers from Telefonica in Europe. So they do this nationally, globally. You see over here financial model, profitability, high initial costs.
13:06Over here towers are very expensive to build. They could be quarter million three hundred thousand depending on the height. It could even be more than that. And once multiple tenants are on a tower, margins exceed 80%. So it's a very nice business to be in scalability. Every time you add a new tenant, their profit goes up exponentially because the sunken cost is already there for the first tenant and then everything thereafter takes very, very little effort and time for the for the tower company. In terms of operational costs, most of the installation costs are by the tenant. So they pay for that all their own.
13:42It's not paid by the town owner. So very profitable margin. So contractual recurring revenue lease terms provide a nice stable long term cash flow, annual rent escalations. They provide a predictable revenue growth for the tower manager tower owner. Some landowners demand higher rent or revenue sharing. So they're very aggressive about how they negotiate up front. Entire companies often buy land leases outright to reduce overhead or sometimes they get easements. They pay for one set fee for an easement. So here's some of the typical documents associated with a cell tower that you would see. So right to the left is a EFR letter. So eligible facilities request letter. This is from the Spectrum act during the Obama administration.
14:31This is a letter directly to the municipality explained that the type of change you're doing on the tower falls within the eligible facilities request that it means that the changes are de minimis. And we'll talk about later on what de minimis means under the under court rulings is a zoning permanent application or also might be construction permit application. It may not need a zoning permit application. If we're talking about changes to tower, maybe expansion will 10 foot expansion of a tower that would not require zoning even under the Spectrum Acts. You see over here structural analysis which shows that the proposed work or the existing structure and any proposed work if there any weight meets national standards for wind load and weight load. And then on the upper right hand side you see construction drawings which depicts the scope of work. So you'll see the number of antennas, the azimuths, direction which the antennas are broadcasting.
15:25The Elevation on the pole. All that would be depicted here on the construction drawings. Here we just see a quick little view over here. I represent three of these towns, Milburn, Shorthills and Maplewood. You see over here a little view on the right hand side. This is from open signal. It shows the areas of weak coverage. So these are areas typically near big parks. There's a reservoir nearby. So you see they have good. Green depicts a good reception. This is along 78, which is a very major thoroughfare in New Jersey to Pennsylvania. And you also see these other areas that are green across major roads and throughways and areas that are more parklands, weaker coverage.
16:07So environmental conditions assessment, some things you want to be aware of if you're going to manage a tower. Either you're looking to develop a new tower or manage the existing tower or things like open spaces and parklands. New Jersey is very strict regulation about open space. It's a very elaborate, difficult process to go through with a local regulatory agency. It might be, you know, green spaces, historic districts. I'm sure a lot of people are familiar historic sites. They may dictate that you have to have a very limited amount of profile for the pole. May limit the hay, for example, or the design islands.
16:44This might be more shore area. Special environmental conditions or prior NEBRA reports all kind of factor in here. So companies like att, Verizon must navigate these environmental conditions. They can be pretty tricky when acquiring sites for teleportation towers. So as I mentioned before, wetlands, highlands, flood zones and conservation areas can significantly impact site selection. A lot of times carriers want to deal with the regulatory hurdles of going through wetlands. Some, you know, they have no choice in terms of coverage and carrier needs and they have to go through it. But if at all avoidable, you find that carriers, they're very best trying to avoid those types of errors. There are some key environmental considerations and implications for telecommunications infrastructure like regulatory impact, federal and state protections. As you probably know, if you deal with any kind of real estate wetlands regulated by the U.S.
17:35army Corps of Engineers under the Clean Water Act. There's other various state environmental agencies which enforce this. And you see that permits could be required in section 405 of the Wetlands Permit Program. Construction restrictions that conduct wetland delineation studies in terms of site conference of jurisdictional wetland. So there's environmental studies that are involved with it. Flood risks, there's FEMA flood areas. You have to make sure that the towers meet a certain elevation requirement or that there's some special engineering designs withstanding flooding events. These Are issues if you're looking to develop but also if you're managing an existing tower. These are types of things that if the tenant's looking to expand on their existing site, go beyond their footprint.
18:15These are types of things you might have to take into consideration and be aware of these type of environmental restrictions. Other types of things look at regulatory impact scenic and conservation restrictions. I mentioned this in case I have one town I represent where high frequency trainer company wants to expand by 10ft higher. And it doesn't come into play here. But I could see that we as part of our review as telecommunications tower manager we made sure that there were no kinds of scenic conservation restrictions. These are deeds that prevent obstructions by towers and the like. So the meat turn that wasn't the case. Some other things we might look at is erosion control responsibility. High elevation sites require geotechnical assessments. Ensure stable foundations and the like. Infrastructure and access challenges sometimes in remote areas might have issues getting through access roads. So luggageway can complicate road access and power supply and fiber optic connections which increases site development costs.
19:12Coastal zones and barrier islands. Think of Coastal Zone Management Act. These are things across the country enforced by local states. You have issues with coastal management programs. Hurricane wind load standards. When you're talking about existing towers and the carrier wants to come and pick bigger antennas, you want to put heavy antennas on there that impacts both the wind load and as well as weight load. And in areas that have extreme weather conditions like tornadoes and hurricanes, you got to make sure that that everything is being designed to withstand these winds. Different engineering standards for these different areas. And then there's endangered species and wildlife habitats. You have Endangered Species act, you have a migratory Bird Treaty act which is, you know, impactful. Tower projects must assess impacts on protected species and bird migration patterns.
20:01So every year and I've been in the wireless industry for 20 years and maybe 25 years and over the last quarter century I've seen the, you know, the cycles in wireless become April. Carriers want to come out and start making upgrades and modifications, repairs. And right when they want to do that, you have a raptor nest, you have some kind of bird or bat nest up there and they're restricted. And tower companies are unable to really go there for several months in total. They're nesting pattern is really is taken care of. And then they could go up there. But I've heard stories from tower climbings about being attacked by big huge birds of prey. And I can tell you it's not very fun. So let's just talk about Starting the process. So the first thing we do is review the prime lease we discussed before. The prime lease is the area is the lease that allows for the construction of the tower. It's a certain area land might be 4 or 800 square feet of space to go and build it. So we'll take a look at that and see what the conditions are in there. See when the lease ends, when it begins.
21:03You want to see if there's any kind of other details that impact the municipality's ability to own you conduct an order of the tower, determine its underlying condition. So in one municipality represented here in New Jersey, where you're having a professional tower climbing come in, go on a tower, make sure the tower is in good shape. No one wants to inherit a tower that's going to be a nightmare to own because it's going to be costly to get it upgraded. Usually these are very well maintained towers. The carriers come in there and constitute inspections. But as a prophylactic measure, it's good. If you are thinking about a municipality taking over ownership of the tower to do an inspection, physical inspection of the tower.
21:38Are there any separate ground and tower leases that are available? And try to ask while it's still the lease is still in effect. See if the tower, the existing tower company will share with them that often they will not. But that adds an extra layer of complication. And I'll explain some of those details later. We'll talk about the chairman directly filed decision. You know, it might be $10 million over a 10 year period and that might seem very attractive. And then they had to take the ownership and have some liabilities. And you have a, you know, informed discussion with the mayor and council, together with their town attorney, their telecommunications tower manager to see if this makes sense for them. And as I said before, I haven't had a single town. Given the substantial material upsides for the municipality, no one's really turned away from it.
22:26Other big things were I said that notice letters to all tower tenants letting them know if the decision has been made to take over tower manager and tower ownership, let them know that, that they're taking over. Tell the prime tenant, who is now the tower manager, that they're not going to renew the lease. I think it's a best practice, you give as little notice as possible just so it avoids any kind of mischief for the line kind of behavior from the existing town manager. You want to do it. Establish a temporary holdover rent until the RFP is issued. Want to establish a minimum rent threshold for RFP and That's needed again because many times they won't tell you, the existing tower owner won't tell you what the other dollar amounts being paid by the tenants on the tower. So you have to come up with the dollar amount. I'll explain how we do that shortly. We issue RFP that includes a lease template. And lease templates are something that you know you should take care of consideration before you release it. It'll be the basis of negotiating the lease. Later on you collect the bids, then you have the business manager, business administration, town reviews all the bids that come in and you mark it up and see who is offering the best. If you have multiple bids on different elevations and then you award multiple tenants, ideally under circumstances, to the existing tenants on the tower.
23:42So here is the prime lease. And this over here is in the termination section of a lease. This is something one of the carri. This is their standard lease. This falls under, on the termination section of lease, it says over here highlighted provided however, that the monopole shall remain on site, become the property of the landlord upon termination of the lease for any costs. So this over here is found in the termination section. And this is the Willy Wonka section. This is where you got your golden ticket for municipality to bring in some good, good amount of revenue for the, for the town. And then you see here that same similar language is found here under section 10 condition of premises was on the termination.
24:23But I guess this really illustrates that you have to carefully comb through the document to make sure you know that it's being properly looked at. So you see the condition of premises and here again you see that the township has a right to take over the monopole at the end expiration or early termination of the lease. Next thing over here you send out notice letters as I kind of detailed before. And you can see over here, this is the notice letters that would be sent out to any tenants on the poll. You see the $4,000 monthly holdover fee. We did this with one of the tenants represent where we didn't know and because the Tyrone wouldn't refuse to give us redacted leases.
24:58So we went ahead and look at the market analysis and determined $4,000 monthly holdover fee until the actual bids came in would be fair and reasonable. So you see the issue RFPs for tower ground space. You see this is a little sample and template over here of little specs excerpt right here. So we talk how we we start collecting monies or how we start giving people the highest elevations. We look over here and see highest bidders in order from highest to lowest bid amount. We'll then be get each given the opportunity to select entire elevation. So every one of these existing tenants, together with people who may not be tenants on the poll are going to bid for any elevation. So this effectively means that if you're a tenant and you're happy with your position on the poll, you know that you're going to be other tenants on the poll and outside tenants who are also going to be bidding against that poll. So from the standpoint of emancipation, this is an excellent opportunity for people to bid against themselves. Effectively. They're operating in the dark. They don't know that they're going to lose valuable space, lose their coverage, they lose their elevation. So this is a great way of getting additional money for your clients, the municipality or the town you see over here.
26:06Across the United States, they seek to lease space on telecom industry tower should follow best practices to maximize revenue, ensure regulatory compliance and attract high quality tenants. So ideally you like companies like rise and AT&T mobile and high frequency trading companies. There's a few of those I deal with right now. Excellent. Have excellent track records of payment, have deep pockets, they're reliable. So these are types of folks that you want on there in terms of good tenants. Kind of like doing a by reputation, like a credit check. You know, they've strong companies with a long history and you don't have to worry about the forfeiture or default of their payment terms. So we have a number of things to look at from the legal regulatory compliance standpoint. You have Federal Communications Commission regulations dealing with things like RF emissions.
26:55There's a certain safety threshold. One of the things I do as a township manager is to make sure we get annual reports. Whenever time they make changes and change their RF propagation profile. We ask for RF admissions to show it's in compliance with the fcc. Continuous exposure to radio waves, make sure it's compliant with inspection use. Stay in local procurement laws. Make sure you follow the state laws about competitive bidding requirements. New Jersey, we do have the municipal land use law and we have the RFP process. Just strictly governed and enforced environmental land use considerations. If you're in protected land, as you said 4 wetlands we use as an example.
27:35Review the environmental impact assessments and any land use restrictions that may impact it. And I gave you a few examples. Wetlands, coastal regions might be height and historic areas, matching streetscapes, things like that would be all factors that you would want to take into account when you're looking for changes in the tower or potentially a new tower going in the area. So if you're structuring the RFP for maximum revenue, you want to go ahead and define the initial lease duration. I recommend 10 to 20 years with renewable options. So usually people come in at 10 years initial, then every five years they renew and try to, for example, come back and try and renegotiate. So it might do a 10 year term, one automatic renewal for five years and then after that you might want to revisit and start negotiating these terms thereafter.
28:23That way you could see make sure that the 3% increases, that's something you agree to. It's still matching on market conditions in the last five years. These 3% increases end up in keeping up with inflation. So you might want to go ahead and revisit a CPI model revenue model annual rent with escalation clauses. Again, three to five years, that's fixed. Again, that's good, reliable, but it may not keep up with inflation as the case in the last five years. Priority for wireless carriers and public safety. So make sure that there's enough space on the tower for public safety communications. They please fire EMS for leasing to commercial tenants.
28:58So they don't usually take much space. So this whip intent is usually at the top and they do not take much room at all. So pre RFP market engagement. I always like to try to get as many people on the carriers and other authorized FCC entities on the polls as possible. So I'll reach out to Verizon, att, T Mobile and Dish. Dish is building out the nationwide network, so I would try. If they don't have Dish on the tower, I'll often reach out to Dish and see if they get them out there. I like to go out to HFT firms. I find we're working with McKay Brothers junk trading and capital Research. All these companies are great and they pay well and they're just professionally, they know what they're doing in the markets. You look at site suitability, you want to provide engineering studies detailing tower height, weight, capacity and RF coverage, power supply, fiber optic backhaul and security requirements for HFT firms. Security requirements because they carry a lot of information between financial service companies and trading hubs like the Wall street and the Chicago Mercantile Exchange. So they wanted these places to be secure and then some public safety priority.
30:08Reserve capacity for emergency communications or municipal broadband issues if applicable. You want to make sure you establish minimum rent thresholds for each available elevation. So existing rent amounts, we want to know what that is. Market analysis, CPI adjustments, municipal preferences and other calculation models which we'll get into here very shortly. So this is something I I do. I make keep track of all the years been in the market in wireless. I keep track of rents. So this NNJ is northern New Jersey, which is where I'm based out of. You see the years, you see all the elevations listed here. The monthly rents that they get from each one of the carriers. So we have the cumulative amount of the annual rent for it. We have the escalators that be collected.
30:523% is pretty standard per annum. You see the method RFP bin lease premises. You see what they are towering ground space or adjust ground space only. We have this all printed out and we see what the average monthly rent is.6585 43. That's how we come up with the rents when we put on the rfp. We have other models we use. That's kind of a straightforward way of kind of calculating it. So you have these agreement templates. You have two options. You have a separate tower and ground space of one for each. That is a little, you know, one way of doing it. Another way of doing is you can merge a tower and ground space into one single agreement which is in many ways more convenient for them. Sometimes like to keep them separate a tower for one in the ground space for another. They like to do that because they want to make sure it they think that it might be giving leverage when they do a renewal. So that's kind of preference compounds. Then the model need not match what was used prior. So since the the lease has expired, you're creating a whole new template, a whole new paradigm. You can go feel free to do whatever you want.
31:56And if you ever have any questions, anyone here represents municipality interested in doing this, feel free to reach out to me about this. I'm happy to lend a hand due diligence. After leasing out tower space. Some of the things we look at is RF safety. I mentioned before that the FCC does establish maximum thresholds for exposure for continuous human exposure. Even if people working on it. OSHA regulations come in play. This is typically done by the general contractor who's going up to do the work. Insurance coverage. Usually it's $3 million for workers, comp $3 million general, $3 million for auto. So you want to make sure that the carriers and their GCs have all those minimum thresholds just case there's an accident.
32:37You can insure the your tower if you buy it. It's pretty novel that expensive. Again with offset. This is one of the types of things we want to factor in as a Liability or cost in your revenue. It's one of the things I want to discuss. Make sure that each tenant names and its plans additional insured. Anyone does with lawsuits understands this helps protect the town and insulates them from litigation. Adequate coverage levels by tenants of the GCS as I mentioned. Usually $3 million individual for workers comp and general liability. Usually it might be an umbrella policy of $10 million. On top of that you see indemnification from acts of tenants. So again you want to make sure by tenants and the vendors on behalf of the landlord that you're covered for that.
33:22So now you own the tower. So we're here at the point right now you now own it. And you need a process in place in order to run the tower. So first thing is you go through the usually construction building department. The carrier comes in, say they want to add three new antennas to their their elevation to the antenna array. So it'll be an application. Usually I establish a fee to be collected to be collected by the from the carrier for. For the work. Usually for the timer consultant gets that money. You see over here, the drawings, the and the like you see over here compared to existing leasing in Thailand. So you look at the lease that was part of the rfp, make sure that they're not exceeding their lease rights. I always like in the lease to look at what's on the tower right now because we're assuming an existing tower with existing tenants with equipment on there. Do a mapping of it, see what's on there and put that in the lease. Explain that is their lease rights and anything thereafter. They need to get an amendment or a consent to put additional equipment. And you can negotiate additional money so you get additional cash injections for the less remaining lease by going ahead and negotiating for additional equipment on the tower.
34:30You have the compliance part of it. You sign a consent letter or an amendment, especially if there's going to be a change to the lease. In terms of rents amounts, in terms of rent amounts. You have expansion. You negotiate lease amendments and rent increases, which is pretty common industry. It's a lot of modifications, expansions. There's always needs to have some sort of redundancy and technology. We have 3G, 4G and 5G running from there. We have some other accessory things like a microwave shot. They need a microwave dish. So they always have needs depending on technology. Then you have the municipal review of billing permit, zoning permit applications.
35:06They review that. Usually I do a lot of the review. I compare against the zoning portion of it. Make sure that meets the standards of our ordinances. So we have a 4G ordinance sometimes represented plus a 5G ordinance. Make sure it comports with that. And then you schedule construction, which is also something a tower manager might be involved with to be on site periodically or during the whole entire construction to make sure things are being done properly. So one thing to be aware of, and I'm sure if you represent a town, you've come across a number of different companies the lump sum monetization offers. You have companies like Crown Castle, sba, you have Vertical Bridge, Everest and the like that come in and they offer a lump sum payment for your tower. Now I always tell my municipalities not to do it, but it may be something good for a town who needs a cash infusion lump sum to take on a very expensive capital improvement. Might be some roads, it might be a new municipal building. Whatever it is, in some businesses you might want to do it. Most of my towns have sufficient capital reserves or are willing to go into bonding type of things for capital improvements, but something certainly could consider for your town. So these companies operate primarily by inquiring existing lease agreements, providing properties with immediate capital lump sum. And then they manage and market the lease sites to wireless carriers aiming to enhance the site's value and generate returns over time.
36:28So you see they offer liquidity. They buy Crown Castle as a rooftop alliance program. They provide cash buyouts, take on the responsibility of marketing became the rooftop site. So the building owner basically gives away rights to the area that's being on the rooftop that's being operated. And the business model benefits property owners by converting future lease income into immediate funds. Again which might be very helpful and thanks to many people.
36:56So here's how it works. These companies operate by acquiring the rights to future lease revenues from property owners in exchange for upfront some payment. And it revolves around a discounted cash flow analysis. They take a risk assessment. What's the likelihood of a tower, you know, one of the tenants backing out? Right now there's three primary players. There's a T Mobile, there's AT and T and Verizon. We lost Sprint during a merger with T Mobile and right now I doubt that demanding merges between those three companies. The FTC barely gave approval for the T Mobile, T Mobile and Sprint merger they were concerned about. The FTC was concerned about lack of competition and Dish was one of the compromises. Dish was supposed to be a fourth Cara which they're actively starting to build right now. They took a to some Sprint T Mobile's spectrum. They're actively building on their network. But right now, in terms of risk, in terms, and the risk being that when the tenants back out, that's lost revenue, very difficult to replace that, I'm going to say that there's very little way of risk right now.
38:00So let's go into a little bit how they determine lump sum payments. They have a discounted cash flow analysis. They estimate the future rental income stream from the existing leases. The lump sum offers a percentage, usually 8 to 12 times the current annual rent based on expected lease longevity and renewal terms. And this formula is going to change. If they were buying it very, very early on in the lease, say it was just to sign within a year, there's another 24 years left out of it, less left on it, they'll give a higher offer and then likewise if it's shorter period time left on the offer be less.
38:33So some of the risk adjustments you see here, lease term and rent escalations, long lease terms and built in rent increases make a lease more viable. So again, length and dollar amounts, tenant credit worthiness, most tenants are on. There are well known publicly traded companies, so no one really worries about them. So much site value and market demand. So locations of high density urban areas along critical infrastructure corridors attract high valuations. So think of roads like 78, Route 80, 95 which runs north and south. OB is going to have people, truck drivers and people commuting along those roads. So these are very attractive sites to be on. Also, tenants such as T Mobile Rise are not going to not want to have coverage along one of these major streams. So the risk of them canceling and losing the tower management company losing revenue is very minimal.
39:22Then you have to look at the lease expiration and renewal probability. If it's near expiration but likely to be renewed, it's worth more. If the carrier may leave, then the value drops. But very often if they've been operating for 25 years, they need the site and renewal as a likelihood. But that is another type of risk that they have to factor in when they're making the lump sum payment to the owner of the tower. So we discussed before it costs up to $300,000 to build a tower, sometimes more. Especially for some of the things that three 400 foot high towers may be half a million, a million dollars, those are a little exceptional, but they are significant amounts of capital expenditure. And it usually takes carriers to make Tariff managers make 7 to 12 years on average to make their money back. So that would be something you might look at for a rooftop installation by a carrier because they're only taking care of themselves. But in towers you make a lot more money. If you have multiple tenants on there, you start making money back much quicker.
40:18So some of the additional revenue sources you can do at least extensions or renewals, negotiate lease renewals at higher rates. Additional tenants, they simply space on the carriers, which increases the site's revenue. So what I usually like to do for my municipal tenants is actively marketed to, to other types of carriers that are not currently on the site. So I'm very aggressive about that and try to bring in additional carriers and then we do it, go through the RFP process. But that is a good way of making money for your clients, reselling leases. Some firms bundle multiple leases rights, sell it to large investors. They kind of bundle this together in tranches. That is another business model for some people in terms of the lump sum monetization and then upgrading sites. You're adding fiber connections or 5G equipment makes them more attractive to carriers. Another way of either asking for additional revenue or attracting other people onto the tower.
41:11Scale a little bit to revenue increases for assumption of tower ownership. So we'll go with this right now. So we'll do a projected site revenue revenue for 2025. We'll look at an example right here. This is what the municipality is making right now. So we have a prime lease. We have tower and ground. You see all the different people on here. So we have AT&T, which was taken over by Crown in terms of owning the tower they bought out AT&T. You have then tower ground itself AT&T. You have two high frequency trader tenants. T Mobile, Verizon, T Mobile. These are all actual. I'm not going to tell which municipality this is. Let's keep their anonymity here. But you see how much the share for the municipality was here was $244,000 that they got under the, under the private lease agreement. Now that they go ahead and own it entirely by themselves, they cut the middleman. They are making $183,000 more a year. So went from $244,427,000, which is a significant jump. Again, when you're talking about everything going up and what people need. The cost of, you know, tar, you know, road servicing, equipment, crux salaries, salt, everything that goes into running a town, DPW department have gone up. This is a really good way of offsetting these inflationary pressures on towns. Here's another town in New Jersey. You see the different towns, Sorry, look at all the different carriers over here. See Crown Also own this tower at&t Verizon, t Mobile and Verizon.
42:40You see over here the different types of revenue that was current. This is what the town made before was under $60,000. They're now making 317,000 here. So roughly $160,000 annual increase. Again, substantial increase in the amount that the town's making. One thing I'm going to discuss now is a Terra managed portal. As I said, I have lucky enough to have an in house CTO who comes up with these portals and apps to make day to day operations manageable. As you see, there's a lot involved with it and we'll go into a little bit of some of the features and functions of a tower management portal. Putting things like site info, put in the elevations and the occupancy status. So just five or six elevations, I'll say which elevations are occupied by who and we'll get into that a little bit and also reflect what are vacant. So use as part of the marketing material. Talk about the tenant general status.
43:34Are they in compliance with the lease? Are they, are they making payments on time? We'll have copies of the lease permits associated with it, a copy of the most recent structural analysis. That's very useful. Make sure you're compliance that TAMRA is meeting its minimum requirements. Safety functions of tenants Submit an access request, make a rental payment. So on this online portal I kind of manage things so that the tenant could come in and put in an access request and put a, you know, it's a little button dial. They click on it, they fill out all information they can submit their drawings, structurals, everything that might be required with permits.
44:11Every all of it can be submitted electronically. Makes things a lot easier. And it also serves as an essential repository for information. Good way of having knowledge management. I don't know if you've ever worked with municipalities, but things are often very haphazard. Things are all over the building. There's no real centralized knowledge management system or centralized organization. Very difficult to find things. And this provides a good way of knowing what's being going on the site. I know many municipal managers and business administrators who tell me that they didn't even know that the lease is about to expire. They had no knowledge of it 25 years ago.
44:48Who knows where these leases are. There's no electronic version of that available. So often they find that last minute that's about to expire. So this is going to bring a lot more organization and order to managing a tower. So here's the tower management Portal menu option. So this is one of the first things we'll see, have an overview, tell you a little about the tower, have some information about the site info, location, lots of longitudes and the like, a little bit of elevation overview. Sometimes we have photos showing what each elevation looks like with antennas, as well as also knowing what's on the tower itself, having some sort of pictorial record, tenant status, info, as I mentioned before, Are they compliance at least, are they current on their rent terms, tenant functions, what they do there? Are they warehouse, carrier, are they HFT or their microwave company or the like?
45:34Are they doing an emergency network, borough functions, attachments, anything that might be attached to it, the original bid documents, any legacy documents that might be there. I'll go through some of little screenshots of my portal, my hotline, you see right here, address, you have the owner, you have the coordinates here. You see the year was built on here. So you know the age of the tower. A big factor for structural analysis to know how old it is, what's been made of the zoning district. This comes into play. If you're looking for somebody to do an extension on an existing tower. You want to know whether or not it's permitted use, what if there's any height restrictions? This is something right here. We give a quick, accurate screenshot. The zoning district itself may have also a reference to the zoning code itself, a link to it available elevations.
46:20And here you see 144ft, 119ft are available. So this also serves not only as a knowledge management, but a bit of marketing. So if a carrier wants to come in, you know that we manage a site or town manages it, a lot of carriers know me, you know, throughout the East Coast. So they know that sometimes to come to the site to see if there's an elevation available. And you see over here the ground space, you see the different elevations laid out, you see ground space that released the tenants, that left blank over here. But there would also be the tenants, you have the status of them. And you see again, you see the different elevations are available, have 119ft over here and 144ft over here, the lease details. You can actually click on lease to see what it looks like. That's very beneficial for anyone who's doing a review of permit applications to look at putting additional equipment on there to see whether or not that triggers an ability to ask for additional compensation because they expand beyond their lease rights. So if you have the lease, but have any amendments, any consent letters, notification letters, I have this all here. To keep a good accurate inventory of everything that's going on on the site. Pavement history you see over here is this notional. But we have payment due date, you know, so usually occurs upon execution of the lease. Typically by being able to start construction is when read each lease will have their own date that it's due. So we'll put that in here. So it's a good way of knowing
47:42when things are due. And have a payment management system. Make sure that all the carriers are up to date on everything. So you see the rent amounts, see the frequency. Some pay annually, some pay monthly. And then you see the statuses over here.
47:57And then here's the submit and access request. So again, keeping things nice and orderly. Any carrier who wants to come in here and start making changes, you see the proposed date and time of visit. Could be a routine maintenance thing where you're changing a filter or they get a report of something offline. Could be a software update, routine maintenance. They could come and put that in here. List all attendees, make sure they have all the contact information. Make sure that the people requesting access to GC or GC subs have proper insurance. As I mentioned before, the minimum threshold is $3 million.
48:28Typically for workers come 3 million. For general liability. You have other types of thresholds. Make sure all that is up to date and valid. Those are things again, best practices to protect town from liability. And you can also submit a complaint. There is a signal interference issue, so you submit a complaint. This is an opportunity for one of the tenants to say hey, I'm getting, you know, variation in our signal or interference. And then we would have to go ahead and kind of investigate, make sure that all the carriers are operating within their FCC permitted spectrums. Well, the document library again try to find things in the municipality to find any kind of documents related to the earliest days of the deal. Include basic things like the lease.
49:12All this have in one consolidated location. We have the latest structure for it. Site survey, site plan, any kind of ground leases that are there, any holdover fees, payment demand letters is a one of the sites we just took over on behalf of municipality. So this is a kind of active screenshot right here on New Jersey DEP map overview. We have like wetlands. We have any other types of things that are environmental that may impact it. Again, you have a municipality or sorry I should say a carrier approach municipality about coming in and expanding their equipment compound. They might have put up an emergency backup generator. They want to expand in many cases from a leasing standpoint that may be willing to make extra revenue, negotiate additional monies. But from a regulatory standpoint, in terms of existing environmental conditions, you may have to go through a process for it. So it's always good to have that information available so that you don't run afoul of any kind of environmental restrictions in your state or location.
50:07So new tower owners, a little caveat. Beware. Some of the things is you want to bid for space near the top of the tower or apply for a usual modification. Sometimes what will happen is you have interlopers come in. They may find another company, say for example high frequency trader. They may try to put a microwave dish, make it clear that they're doing for their own use, when in fact they're using it for another high frequency trader. They're paying 8, $9,000 a month and they're effectively taking that revenue. So we want to have somebody like I know how to recognize these things. Takes a bit of an eye and being industry for as long as I have last 25 years to pick it up. But this is the type of thing you want to prevent because it's a loss monetization opportunity for your client. So again, they may intend to supplement their elevation at a much higher rate than they lease it for. If anything at all, they may just say, hey, we're just gonna. This is part of our itinerary. We're going to add the microwave dish and then really subleasing to someone else and they're making a real clone on it. Obviously you want your client to benefit from it.
51:09So buyout offers, like I said, I'm going to give a little bit of a breakdown about why I recommend and I show this to my clients, municipal cities, why we think that we should keep it. So you might find for example, a 1500 1% payment might be a typical type of buyout. I see more than that, but that's kind of a typical buyout. It's a nice sum of money and you might have to require. In New Jersey, for instance, we have to bid out this to see whether or not other higher offers might go through a process. But let's just look at the dollar amounts. First million half dollars. Sometimes they'll take that offer and they may offer $1.65 million if they can pay it out over five payments over the course of time. But they also, it's kind of loses control till the end of time. So whenever long it's 50 years, you want to give me easement in that area. You lose control of the area plus the monetization area. Of possibilities. But you see that the offer five payments and since it spread over time, they don't do one immediate lump sum payment. They, they're willing to pay a little bit extra money for it. So let's take a look over here of a rent revenue projection versus buyout offer. So you see over here, this is what you could get in a single year. So you go over different rents. They have them here. You get $281,000 per year.
52:19And you see that that rent, the amount of $1.65 million could be made in six years. So if you're looking to do this, the carrier makes back everything they paid in six years and everything after that, say 20 years. That's 14 years more than making a whole lot of money. So that's why I always recommend my tenant, my clients, to keep hold of their lease and not to succumb to the siren call of a buyout, lump sum buyout. So let's do a little bit about management responsibilities with tower ownership. Municipalities do take on management responsibilities. It can be complex but manageable. I think when you look at something like my portal that we have that I use my municipalities, it is complex. There's a lot involved with it.
53:01But if you're organized and you have a good tower manager to do this, it's not so onerous that something that I want you as a lawyer to feel overwhelmed by their other resources that you can do for your cities and towns you represent. Usually an upkeep and maintenance is handled by carriers and the new leases made throughout the rfp. This is worked into the new leases directly between carrier and the governing body. And the remaining responses may be handled by a consultant. So typically the town manager themselves that the town will hire.
53:33So the role of a tower management consultant. A tower management consultant can assist in these paths in managing tower ownership. Helps navigate the RFP process. That's a thing most local municipal attorneys and administrators don't know how to handle. And I do this all the time. So it's, you know, second nature to me. But it's something that is kind of daunting and there's a lot involved with it. You know, making sure you have all the right requirements and terms, set risk thresholds. That's that market analysis I discussed for managing new agreements. Sure. The site is maintained a need only manner periodic looks at the area. That can easily be done by internally by the DPW department as well or construction department. You got to make sure that tenants are not exceeding lease rights. That's done by routine Inspection of the towers, looking at the lease agreements compared to the construction drawings being submitted by the applicant. Consultant costs. Some consultants take a certain percentage of revenue as a consultant cost as high as 20, 25%. I don't take any of the revenue that goes directly to the municipality. I usually do make my living by the application fees that the carrier pays. So I usually take the application fees. But the revenue goes entirely under my business model, directly to the town.
54:44So in that way there's no cost to jurisdiction. So day to day responsibilities of power manager, site access and maintenance coordination, granting access to carriers, technicians, subcontractors. For equipment upgrades, repairs and new installations. You make sure ensuring compliance with safety protocols and security requirements. Make sure everything is locked up before they leave. As I mentioned, these are very expensive equipment. A lot of data flows through there. So don't make sure their equipment compound is being locked at least. I mean it's just a chain lock, but sometimes the guys work on it, they leave it open. People do pillage and vandalize these places. A lot of these wires are made of copper. So for a lot of people who are burglars or vandals or whatever, people take it and sell it. So it's important to keep it secure.
55:32And again, any unauthorized modifications, you go retroactively back back to the carrier. If you pick it up in front, usually should pick up in front of you're paying attention. You can then go retroactively. Say, hey, you buy a lease, you came in such and such a date, put this over here and you didn't have the lease rights for it. And let's sit down and talk compensation for the rest of the lease term Site inspections are repairs when it could conduct periodic inspections, can be quarterly or annually to check on structural integrity, lighting, security, internal maintenance, identifying and coordinating repairs for issues like rust, repainting it, for example, damaged fencing or electrical problems. Usually lights inside the compound itself. So in case people come in the middle of night to do maintenance repairs for emergency conditions, make sure those lights are working as well. Again, these are very important things in terms of the inspections, I usually ask the tenants, I build this into the RFP itself to do their own structural reports themselves. I require them to do this on a periodic basis. And that way I keep it in that portal, make sure that we know that the structural integrity of the tower is in good condition. So how often does the tower manager visit the site? That depends. I do quarterly, sometimes annually inspections depending on the level of depth. I'm looking into care of maintenance visits. Usually when It's a wireless carrier like Verizon attcris. Ask for maintenance.
56:56I visit the site, I just make sure everything is in order. After major weather events, these are good times to go there. Typically the carrier will know if a tenant got blown off because they'll lose reception, they'll lose traffic and they'll get alerts on it. But sometimes there are things that may not impact their ability to run the site that may be structural nature. So always good after a major weather event and after new 10 installations, make sure everything is done properly, usually in terms of the construction department and the like. So remote monitoring, inspection tools. These are some good ways of making sure things are done in a work like manner. If you're not going to physically be there all the time, which you can't be inspections a lot of folks, I require it especially for higher elevations, you know, to have a company come in that specializes in going around the tower, do some 3D mapping or digital map of the, of the area to make sure that everything's being done properly, that things were installed that should have been installed when you weren't looking. Sometimes carriers will go in there and do upgrades.
58:01You know, they call it maintenance. In fact it's an upgrade or any equipment. So sometimes you can't catch everything. But this is a good way of catching cheats. You have Internet of things sensors, remote monitoring. You have companies install sensors for power usage, security and equipment failures. Reduces the need for frequent site visits. So that's a good way of doing it. And then you have scatter systems used to remotely monitor tower lighting, power stats, alarms for unauthorized access. So let's do a telecommunications regulatory refresher, talk a little about the governing statutes and case law. So the grandpapy of all telecommunications laws, Telecommunications act in 1996, sections 253 and 332 from 96 under Clinton Administrator, Clinton administration legislation.
58:48So you see there's a whole bunch of regulations and rulings and case laws that come from these two sections are pretty brief, but written in such a way that it took a lot of judicial clarification. You see that it's a partial preemption of local land use controls and ideas to have some sort of national standard for rolling out technology. Back then 2G, 3G we wanted to make sure that there was going to be undue, onerous, precious regulations from local municipalities. And that's what the TCA was meant to do. So if you deny someone, delay or deny someone, that could be considered prohibition. That's one of the key things you can't do in sections 253 and 332. This had discriminated practices amongst different carriers and having either de jure or de facto prohibition against service.
59:38That would be violation in these two acts. More recently, there's a further preemption on local municipalities by the federal government under the Spectrum act of 2012. Obama piece of legislation. Microsite preemption could affect your cell phone tower. So for example, you lose a lot of control because there's what's called the eligible facilities request. That means efr which means that if there are certain upgrades to existing tower sites must be approved by the local business primate's jurisdiction from zone perspective, which is still permitted. But there is a standard, what's called de minimis changes.
1:00:15So it's something which wasn't described in the Spectrum Act. But you see over here in 2014, 2020 there were FCC rulings which describe de minimis as any height increases less than feet, protrusions from the edge of structure less than 6ft that does not require zoning insulation of less than 4 cabinets, 4 and less cabinets and maintains existing concealment elements of structure. So if you meet any of these, you can't go through a discretionary zoning hearing under the Spectrum Act. We're going to look into contracts law over here. Basically basic contracts law. You learn ticket law school offer. Usually it's RFP for the supplies offer.
1:00:54From there the acceptance is by the carrier. When they respond to it, they come back with sometimes some. They'll have some acceptance they have with it, but basically engaging in a dialogue. It's their acceptance of the RFP come in agreement. Consideration of monthly rents. Meeting the mines of course is a lawful purpose comply with zoning and public land use rules. Provided that there's no federal preemption that has complied with state public contracts law and the like.
1:01:22So especially for our rfp. Thank you. See, that may contain automatic renewals and evergreen clauses and the like. So let's get into conclusions and takeaways at this point. Use of public land for private purposes. Things to keep in mind governance framework typically governed by state public contracting laws. So New Jersey's LCPL and LLBL and local ordinances. You have the federal TCA Telecommunications Acts of 253 and 332. Municipal landing includes parks, utility lots, DPW yards. Keep all this in mind. These towers where you might find them in a municipality. Some of the common approaches, remember the towers off of lease land or license rooftop access to wireless carriers and tower companies. Agreements usually require governing body approval in many states, public bidding or a piece. These terms usually range from 10 to 30 years. Keying considerations Is the arrangement consistent with any applicable public trust doctrine?
1:02:20Evaluation methods Reasonable I went over this a little bit. Market comps, appraisals, engineering cost models. I discussed my methodology at least one of them and notable state differences. You'd see that New Jersey requires public bidding for long term leases of public land unless specific exceptions apply. But home rule states some may bypass bidding short authority so be familiar with your own local state laws Tower Management Remember we discussed as a kind of overview right now towers or leases are expiring now. So late 1990s, early 20s, 25 years is meaning right now they're expiring. Check your tower prime leases if you get access to it process to acquire ownership and to imagine we discussed already lease audits, notice letters, set up, rental payment transfer issue, RFPs. We went through all this and you know much involved with it, but it's manageable. As I said, complex but manageable.
1:03:15Process Tower Town Hall Review your prior lease and determine your options for assuming tower ownership and control once the lease expire. Tower management company involved Be mindful of early contact and renew leases and company bought out tower leases years ago. Determine the arrangement that will come from doing a lease audit again. I'm Pete Lupo from Hubline Communications. If anyone has any questions on this, call separately. My email is over here, my telephone number as well as a fellow professional. If you want to reach out to me for help in your municipality, or if you'd like me to do the RFP process as well as the actual town management, please reach out to me. Thank you very much.